2012年3月22日 星期四

Week 7 - BPR Methodologies


Reference:
Davenport, T. and Short, J. (1990), ``The new industrial engineering: information technology and
business process redesign'', Sloan Management Review, Vol. 31 No. 4, pp. 11-27.
Grover, V., Jeong, S., Kettinger, W. and Teng, J. (1995), ``The implementation of business process
reengineering'', Journal of Management Information Systems, Vol. 12 No. 1, pp. 109-44

In this lecture, the BPR methodologies have been introduced.  It is a set of guidelines that enable an analyst to derive ways for problem solving.  They are used as an enabler for automation by using Information Technology and a tool for creating a major change in business process.

BPR methodologies are divided into 5 stages and they are:

1.       Visioning
2.       Mobilization
3.       Process Redesign
4.       Implementation
5.       Monitoring and maintaining

Each phrase has a significant contribution to the implementation of BPR.

Phrase 1: Visioning
It is the first phrase and it is the most important phrase as it defines the objective and direction of the business.  It helps to identify the current business problems and reveal the inefficiency of different processes.  It considers the current problem from a wide perspective, from internal to external.   For example, duplication of documentation and delay completion can be the problem of internal.  While slow-response rate and dissatisfaction form customers can be external problem.

Phrase 2: Mobilization
After defining the ideal objective of the business and discovered the current business problems, it is needed to gather the team members and the top management in order to undergo the project.  Sufficient number of IT people is needed to ensure more information for the redesign process and ensure the project can corporate with IT infrastructure as planned.

Phrase 3: Process Redesign

It is the phrase to analyze the existing “As-Is” process and select the best “To-Be” design.  Through scoping, modeling, analysis, redesign and integration, the process knowledge will be known and the advantages of the “As-Is” model can be extracted and the problematic parts can be removed.  As a result, the “To-Be” model can be proposed after the analysis in the five aspects.

Phrase 4: Implementation
In this phrase, it is important to ensure the IT infrastructure to meet the “To-Be” model requirement.

Phrase 5: Monitoring and Maintaining
In this phrase, it is mostly about the monitoring work to see if the processes under the new redesign run well or not.  Some processes might be modified slightly when it is necessary.

Importance of the 5 phrases
BPR helps large businesses to integrate their fragmented processes, reduce the switching cost between the departments and increase the efficiency.  The 5 phrases present an important role to ensure the benefits come true.

Video-Sharing:

http://www.youtube.com/user/Cordysvideo?v=_369sK3DPYM